Wednesday, August 04, 2010
180/365: Canned
179/365: Disposable
Labels: Project 365, The House
Sunday, June 13, 2010
134/365: Owls
Labels: Project 365, The House
Thursday, January 08, 2009
Who You Trying To Jive With That Kitchen Debris?
The bathroom is essentially done, but the workers are storing their tools in there, so no pics yet.
Friday, December 19, 2008
New Room
Labels: The House
Tuesday, December 16, 2008
Curiosity
ALMOST killed the cat!
The guys finished up the plumbing today, and installed a new subfloor. Unbeknowst to them, and to us, Tawney managed to get under the floorboards and was sealed in! I didn't realize he was under the floor until about two hours after the guys left. It was then that I heard his pitiful mewing from under the linoleum.
Anyway, we managed to cut away some of the brand new floor joists (damn) and lured him out with a can of tuna. Tawney will be living upstairs with my sister until this project is done!
The guys finished up the plumbing today, and installed a new subfloor. Unbeknowst to them, and to us, Tawney managed to get under the floorboards and was sealed in! I didn't realize he was under the floor until about two hours after the guys left. It was then that I heard his pitiful mewing from under the linoleum.
Anyway, we managed to cut away some of the brand new floor joists (damn) and lured him out with a can of tuna. Tawney will be living upstairs with my sister until this project is done!
Labels: cat blogging, cats, Tawney, The House
Changes!
Well, I finally bit the bullet and took out a home improvement loan to get my bathroom and kitchen redone. The contractor is starting with the bathroom, and will do the kitchen after Christmas. He's going to tear the room down to the walls, and rebuild it, as it has all sorts of problems (the biggest, in my opinion is the lack of ventilation).
Labels: The House
Demolition complete, and time to start rebuilding! Once the guys got the floor up, they discovered just about everything was wrong with the way the bathroom was built. The plumbing is routed badly, floor joists are incomplete or incorrectly placed, the tub was literally too heavy for the floor, and the vent pipe is incorrectly installed. What a mess! They'll be reconfiguring the plumbing today.
Labels: The House